Skills Test Answers - Six Sigma Black Belt

What is mode?

Then mid point of a distribution
The average of the mean and median
The most frequently occuring data point in a set of observations
The arithmetic balance point of a distribution



How is the risk priority number in a FMEA exercise derived?

occurrence x detection x control
severity x occurrence x detection
severity x occurrence x risk
severity x risk x detection



What does the total area beneath a normal curve equate to?

2
0.5
1.5
1



Measuring a process' performance against that of a best-in-class peer or competitor, and then using the findings to identify opportunities to improve, is defined as what?

Six Sigma improvement
Contol charting
Benchmarking
Control defining



Which of the following are potential benefits of Process Mapping?

To reveal unnecessary, complex, and redundant steps in a process.
(All of these)
To compare the actual process, and all its variations, against the ideal process
To give all team members a single, common view of the entire process



What does a diamond symbol signify in a Process Map

Repair Station
Decision
Beginning
Ending



Which quality innovator formulated the cause and effect diagram?

Okinawa
Juran
Ishikawa
Deming



Team empowerment derives from: A. The organizational management B. Access to organizational information C. Access granted to organizational resources

A
A and C
B and C
C
A, B, and C



When the mean of the process is outside the customer specification limits the value of Cpk will be:

Negative
1
2
0.5



Which of the following is an INAPPROPRiate application of a Pareto chart?

A critically weighted ranking of categories
An alphabetic based ranking of categories
A financially weighted ranking of categories
A frequency based ranking of categories



Which of the following is NOT a DMAIC term?

Measure
Analyze
Define
Cause



When considering the "rule of thumb" that 20% of the inputs result in 80% of the outputs, what graphical tool is effective for prioritizing Critical X's?

Control Chart
Pareto Chart
Bar Chart
Skew Chart



The surface appearance of a refrigerator is not satisfactory. This statement is the outcome of what analysis/evaluation?

Range chart analysis
Attribute Measurement
Variable Measurement
Mean chart analysis



Six Sigma is a managerial approach designed to create processes resulting in at most how many defects?

0.34 defects per million opportunities
340 defects per million opportunities
34 defects per million opportunities
3.4 defects per million opportunities



A team has been asked to improve the small purchase process in a firm. They decide to create a flow chart of the existing process because it will:

Rank costs
Improve takt time
Identify wastes
Prioritize delays
Visualize the process



What first step should six sigma projects begin with?

Initiation
Charter
Define
Analyze



What does SIPOC stand for?

Suppliers, Inputs, Procedure, Outputs, Customers
Systems Inputs, Process, Outputs, Complex
Suppliers, Inputs, Process, Outputs, Customers
Simple, Inputs, Procedure, Outputs, Constructs



When would Cp equal Cpk in a capability index calculation?

When the process is perfectly centered
When Cp=pp
When the standard deviation is less than 1
When the specification limits are wide



Statistics are an important part of the analysis phase. What is the largest value minus the smallest value?

The mean
The variance
The range
The standard deviation



The objective of Design of Experiments (DOE) is to:

Establish the best graphing method to illustrate process performance
Map all process steps and determine their average duration
Determine the mean and standard deviation of a population
Find the right settings for key process input variables, to optimize process performance



The mentor for a Green Belt exam should be at least be designated what?

Master Black Belt
Black Belt
Champion
Green Belt



Excessive conflict within a work team: A: Has a positive effect on creating alternate solutions B: Most often results in lose-lose situations C: Has a negative effect on team members and should be avoided

C
B and C
A
A and B
A, B, and C



In an estimated Rolled Throughput Yield (RTY) equation, what is the Defects per Unit (DPU) threshold limit?

<20%
<15%
<30%
<10%



The proportion of units that go through a process for the first time without defect is called:

the success yield
the first pass yield
the first pass inspection
the KPI



Callaway makes golf clubs. Which of the following is not considered one of Callaways internal customers?

Marketing
Packaging
Distribution
Retail Store



Why are variable control chart subgroup sizes generally 3, 4, 5, or 6? A: Larger subgroup sizes would permit an opportunity for process changes with the subgroup. B: They easily fit on traditional chart paper C: They are large enough so that averages of data will follow the normal distribution D: They permit a separation of within time from time-to-time variation

B and C
D
C
A
A, C, and D



True or false? Regression tests are functional tests.

False
True



When implementing Statistical Process Control which of the following would be considered undesirable?

The SPC is used for tracking transaction times at a warehouse
The lower control limit for the R chart is 0
The control limits are wider than customer specification limits
The process is already in statistical control



The over-arching intent of a Six Sigma analysis is to:

Eliminate all forms of waste (defects, waiting, over production, etc.)
Reduce variation to be within the customer's specification limits.
Center the process mean to align with the customer's target.
Reduce variation to be within the customer's specification limits, and to center the process mean to align with the customer's target.



Which of the following tools is used to translate broad requirements to specific requirements:

Data chart
Process chart
Quality Control Plan
Critical to Quality (CTQ) tree



TPM efforts attempt to minimize six big losses. Which of the following would NOT be included:

Reduced yields
Equipment failure
Employee absenteeism
Setup and adjustment



True or false? Benchmarking always focuses on companies within the same industry.

True
False



True of false? You can always use the same standard deviation when calculating a sigma score, regardless of time frame.

False
True



Which of the following reflects the meaning of the word “Poka –Yoke”?

Low Quality
Expensive
With defects
Mistake Proof



Which of the following techniques is most suitable to collect requirements at the earliest stages of designing a process or a product

Muka
QFD
FTA
FMEA



What is the F distribution used for?

To study the equality of two variances
To analyze data
To study the equality of two means
To review errors



The tendency for highly cohesive groups to lose their critical evaluative capabilities is:

Human Needs
Nominal Group Technique
The Skinner Box
Groupthink
Cognition



The QFD process can be described as:

Technical results driven process
A customer driven process
Financial metrics approach
Parametric approach
Customer competitive assessment



When used together for variables data, which of the following pair of quantities is the most useful in preparing controls charts?

R, sigma
t-test, chi-square
X-bar and R
p, n
AQL, p-bar



What six sigma technique is used to quantify the amount of error in a measurement system?

Gage R&R
Standard Deviation
Poisson Test
Process Capability



Which of the following methods model the effect of two or more inputs on an output variable?

XY Diagram
Linear Regression
Multivariate regression
Correlation coefficient



What is the most logical reason for using short run SPC charts?

There is a need to simplify the process
There is limited data
There is a need to plot multiple variables per chart
There is limited operator time



Which of the following devices are associated with the visual factory

Standard work instructions
Work cells
Queue times
Andon boards



Which of the following is NOT a common categorization in Value Add Analysis?

Value enabling
Non value adding
Value adding
Value failure



Which of the following represents how variance is computed?

Average squared deviation of each individual data point from the mean
Difference between maximum and minimum value of a set of data points
Average deviation of values from the mean of a data distribution
Average of median and mean



The distribution of the average of n samples will follow which distribution as n becomes large?

Normal
Lognormal
Poisson
Exponential



My company operates at a yield of 68.27%, At what sigmal level is my company operating at?

5 sigma
2 sigma
3 sigma
1 sigma



The following objectives are relevant to which Phase of a DMAIC Six Sigma Project: * Identify the measurable Y metric that will be improved. * Define a defect from the customer’s perspective * Ensure that you can trust the measurement of the Y

Define
Measure
Analyze
Improve



A process resulting in 99% accuracy to customer specifications, is equivalent to what Sigma level (Process Capability)?

5 Sigma
6 Sigma
4 Sigma
3.8 Sigma



Quality Function Deployment (QFD) is what kind of a tool?

Diagnostic Tool
Check Sheet
Planning Tool
Quality Tool



What variable is used to describe a sigma score?

Y
Chi
Z
X



Why is acceptance sampling conducted?

To estimate if the entire lot is of acceptable quality
To estimate whether or not the quality of the parts is acceptable
To remove bad parts from the sample
To determine if every part in the lot needs to be tested or not



The following objective is relevant to which Phase of a DMAIC Six Sigma Project: To identify the process and Critical to Quality (CTQ) parameters which will be improved, using Voice of the Customer (VOC), Quality Function Deployment (QFD), Pareto Chart, etc.

Define
Measure
Analyze
Improve



Which of the following is not the preserve of a "Project Champion"

Provides technical six sigma expertise
Defines Projects
Breaks down roadblocks
Helps recruit team members/obtains resources



After the completion of a process improvement, what two actions are required? A: The operating manual must be revised B: The operating documentation must be updated C: Management should be trained on the new changes D: The documentation users should be trained on the changes

A and C
A and B
C and D
B and D



Subgroups are used in which types of SPC charts?

nU charts
Z Charts
MR Charts
Xbar charts



Which of the following would be an observational study?

a behavior chart
a box and whisker plot
a histogram
a bell curve



Which of the following sets of variables can be controlled to change performance in six sigma?

Transparent Variables
XY Variables
Independent Variables
Dependent Variables



A chart that contains defect types on the X axis, customers on the Y axis, and numbers of defects at the corresponding column and row intersections is called:

A pareto chart
A matrix diagram
A control chart
A cause and effect diagram



The expected (theoretical) value for a cell in a contingency table is calculated by which formula:

(O-E/E)
row total * column total / column total
(Rows - 1)(Columns -1)
row total * column total / grand total



Which of the following would non-functional testing be used for?

Testing a system's architecture
Testing a result
Testing a specific function
Testing a program behavior



When the Upper Specification Limit (USL) and Lower Specification Limit (LSL) for a Six Sigma Process are plotted on a Normal Distribution, they are located at:

+6 standard deviations and -6 standard deviations from the Mean, respectively
+1 standard deviation and -5 standard deviation from the Mean, respectively
+5 standard deviation and -1 standard deviation from the Mean, respectively
+3 standard deviations and -3 standard deviations from the Mean, respectively



A Six Sigma Black Belt would be responsible for all of the following except:

Line management of improved processes, post-implementation
Applying Kaizen thinking to drive continuous improvement
Training organisation staff in six sigma techniques and team work
Use analytics tools to identify root causes of problems



What does a control limit indicate?

Desired upper or lower performance limits
a process event or measurement is likely to fall outside that limit
a process event or measurement is likely to fall within that limit
he boundary of the bell curve in a normal distribution



What does 5 sigma represent in defects per million opportunities (DPMO)?

3.4 defects per million opportunities
6,210 defects per million opportunities
233 defects per million opportunities
66,810 defects per million opportunities



What information does Cp convey?

Lowest value in a range
Highest value in a range
Process potential
Process performance



Which of the following is NOT an example of non-functional testing?

Black box testing
Endurance testing
Baseline testing
Compatibility testing



Which of the following is NOT a normally accepted control chart interpretation rule violation?

Seven or more consecutive points above or below the center line in 20
Six or more consecutive points, upward or downward, in more than 20 plot points
Ten points in a row in zone 1
Two or three points in zone 3



Which of the following statements is false with respect to Gage R&R?

Gage R&R can be performed before conducting Process Capability or Machine Capability studies, to ensure that the measurements used are reliable indicators of the process or machine output.
R&R can be used to analyze control charts, and reduce common causes of variation
R&R can be used to qualify operators proficiency on specific measurement equipment.
When conducting an R&R Study, you must not use production parts, or parts that are similar to production parts



Of the following, for what purpose would a p-chart be used?

Measure variation
Monitor the fraction defective
Monitor the number of defective per unit
Measure the central tendency



"Process ACME" involves the manufacturing of Smart boxes. In Process ACME, A,B,C & D are the opportunities for defects. In one such process, 20 defects were found in 100 smart boxes made. What is the six sigma level at which Process ACME is operating?

3.252
3.145
3.5
3.4



A F-distribution most closely resembles:

An exponential distribution
A t-distribution
A chi-square distribution
A log normal distribution
A skewed distribution



In Measurement System Analysis the variance contribution allowed for Gage R & R is a maximum of:

15%
10%
30%
20%



Which of the following is NOT an automated regression testing tool?

Tinderbox
BuildBot
TinderBot
TeamCity



There is a 50% chance that a bike will be produced with a defect. This probability is called the:

DPMO
first pass yield
throughput yield
DPU



Cpk has been calculated for a stable, non-automated process. Then, the operator is told to check samples at random and make centering adjustments based on the sample readings. One would expect that:

Process capability has improved
Process capability has gotten worse
The outcome is unpredictable



If four inspectors were evaluated for the detection and non-detection of a defect in twenty samples, how many degrees of freedom would be used to determine the critical chi-square value?

6
3
16
8
4



A manufacturer of bicycles would like to visualize where the defects occur on the bicycles. The defects encountered so far include missing bolts, paint peeling, missing decals, sharp edges, and bent metal parts. A useful tool for this application is a:

X-type matrix
Scatter diagram
Regression analysis
Measles chart
Histogram



Kanban concepts include all of the following, EXCEPT:

Delivery of components and products only when needed
Wide applicability to repetitive and non-repetitive production plants
Minimal storage in production areas
Distress throughout the production system when a machine failure occurs



Which of the following statements is NOT true regarding the short run set chart?

The X-bar value is subtracted from the target
The control limits are looser than with X-bar and R charts
Both high and low range values are plotted
It can be used to plot die cavity data



Kano Model shows the path towards what behavior?

Satisfying a customer
Annoying a customer
Meeting the expectations of a customer
Delighting a customer



The accuracy of a measuring instrument is linked to the U.S National Standards by:

Standardization
Capability
Confirmation
Traceability
Stress tests



What design methodology uses the IDEA process for product definition and development?

TRIZ
Pugh analysis
Systematic design
Portfolio architecting



What is the primary metric used in baseline measurement?

Input
Customers
Output
DPU



Which of the following statements about the Student T distribution are true? i) It has a mean of t=0 ii) As the sample size reduces, the student t distribution gets closer to the standard normal distribution iii) The standard deviation of the t distribution is always greater than 1

2 & 3 only
1 & 2 only
1,2 & 3
None